MG娱乐场

News
You are here: > BERIS > News
BERIS Wins EPC Contract for Water System Optimization in the Utility Plant of JISCO
Hits:  Time:2015/2/9 12:38:16  Author:Yu Xuefeng of BERIS

   On November 3rd, 2014, BERIS received a Notification of Award that BERIS is successfully awarded with the contract for the technological optimization of the water system for stainless steel production area and the optimization and upgrading of the 2,000,000t/a soft water preparation station in the utility plant of Jiuquan Iron & Steel Group Co., Ltd. (JISCO).

  The above two projects won by BERIS are scientific and technological projects of JISCO in 2014. The projects mainly include: replacing the existing hydrogen ion exchanger with a sodium ion exchanger, reconstructing pretreatment and salt regenerating facilities and adding a remote electrical and automatic system at the 2,000,000t/a water softening station, in order to realize auto-operating and remote monitoring of the 2,000,000t/a soft water preparing facilities; replacing the existing floating bed sodium ion exchanger with a fixed bed sodium ion exchanger, reconstructing salt regenerating facilities and adding a remote electrical and automatic system at the water softening station for stainless steel production area, in order to realize auto-operating and remote monitoring of the soft water   preparing facilities at the water softening station for stainless steel production area; adding one cooling tower in the clean circulating water system for stainless steel Steckel furnace to reduce the temperature of clean circulating water supplied to the furnace.

  Duration of the project is 60 days and it is expected to be completed and put into operation on December 31st, 2104.

返回顶部

XML 地图 | Sitemap 地图